forgeplan estimate

forgeplan estimate turns an artifact’s Functional Requirements and Implementation Phases into an effort number. It reads the complexity of each item (Fibonacci 1/2/3/5/8/13) and multiplies by the grade profile from your config — junior, middle, senior, principal, or AI — per domain (backend/frontend/devops/ai_ml). Review overhead and a safety margin are added on top, so the output is a realistic planning number, not a best-case.

  • Sprint planning: estimate every candidate PRD/RFC to fit capacity (≈40–50% of nominal).
  • Capacity check before committing to an epic — is this 2 weeks or 2 months?
  • Delegating to a teammate — --grade middle to see what the task looks like for them.
  • Agent planning — --grade ai to get the AI-assisted fast path (×0.03–0.4 multiplier).
  • On Notes or Problems — they have no FR/Phase structure to estimate.
  • As a contract — estimates are for planning, not promises. Calibrate with calibrate-estimate after the fact.
forgeplan estimate [OPTIONS] <ID>
<ID> Artifact ID to estimate
--grade <GRADE> Override grade for all items (junior|middle|senior|principal|ai)
--my-grade Use grade profile from config (domain-aware)
--llm-score Use LLM-based complexity scoring instead of rule-based heuristics
--complexity <COMPLEXITY> Manual complexity overrides: FR-001=5,FR-002=3 (Fibonacci: 1,2,3,5,8,13)
--json Output as JSON for machine consumption
-h, --help Print help
-V, --version Print version
Terminal window
forgeplan estimate PRD-001 --my-grade

Output:

PRD-001 — Auth System
FR-001 login flow complexity=5 senior → 6h
FR-002 session refresh complexity=3 senior → 3h
FR-003 logout complexity=2 senior → 1h
Subtotal: 10h
Review: +20% → 2h
Safety: +15% → 1.5h
Total: 13.5h senior (≈ 2 days)
Terminal window
forgeplan estimate PRD-001 --grade senior
forgeplan estimate PRD-001 --grade ai

The AI line uses ×0.03–0.4 multipliers depending on item type; use both numbers to decide when to drive yourself vs delegate to an agent.

Terminal window
forgeplan estimate PRD-001 --complexity FR-001=8,FR-002=2

Use when heuristics misjudge complexity (e.g., an “easy” FR hides a migration).

Terminal window
forgeplan estimate PRD-001 --llm-score

Asks the configured LLM to score complexity per FR. Slower, but catches semantic nuance the rule engine misses.

LineWhat it shows
per-FR rowcomplexity (Fibonacci) × grade-multiplier = item hours
Subtotalsum of item hours
Review+20% overhead for review cycles (adversarial, audit)
Safety+15% buffer for surprise
Totalrealistic sprint-planning number

Red flag: totals over 40h — consider splitting the PRD or escalating depth.

route → new → validate → estimate → sprint commit → code → calibrate-estimate

Feed the total into your sprint capacity (a senior dev planning at 50% capacity has ~20h of “estimate hours” per week). After the sprint closes, calibrate-estimate shows how accurate the number was.