forgeplan estimate
forgeplan estimate turns an artifact’s Functional Requirements and Implementation
Phases into an effort number. It reads the complexity of each item (Fibonacci
1/2/3/5/8/13) and multiplies by the grade profile from your config — junior, middle,
senior, principal, or AI — per domain (backend/frontend/devops/ai_ml). Review overhead
and a safety margin are added on top, so the output is a realistic planning number, not
a best-case.
When to use
Section titled “When to use”- Sprint planning: estimate every candidate PRD/RFC to fit capacity (≈40–50% of nominal).
- Capacity check before committing to an epic — is this 2 weeks or 2 months?
- Delegating to a teammate —
--grade middleto see what the task looks like for them. - Agent planning —
--grade aito get the AI-assisted fast path (×0.03–0.4 multiplier).
When NOT to use
Section titled “When NOT to use”- On Notes or Problems — they have no FR/Phase structure to estimate.
- As a contract — estimates are for planning, not promises. Calibrate with
calibrate-estimateafter the fact.
forgeplan estimate [OPTIONS] <ID>Arguments
Section titled “Arguments” <ID> Artifact ID to estimateOptions
Section titled “Options” --grade <GRADE> Override grade for all items (junior|middle|senior|principal|ai) --my-grade Use grade profile from config (domain-aware) --llm-score Use LLM-based complexity scoring instead of rule-based heuristics --complexity <COMPLEXITY> Manual complexity overrides: FR-001=5,FR-002=3 (Fibonacci: 1,2,3,5,8,13) --json Output as JSON for machine consumption -h, --help Print help -V, --version Print versionExamples
Section titled “Examples”Estimate a PRD for your own grade profile
Section titled “Estimate a PRD for your own grade profile”forgeplan estimate PRD-001 --my-gradeOutput:
PRD-001 — Auth System FR-001 login flow complexity=5 senior → 6h FR-002 session refresh complexity=3 senior → 3h FR-003 logout complexity=2 senior → 1h Subtotal: 10h Review: +20% → 2h Safety: +15% → 1.5h Total: 13.5h senior (≈ 2 days)Compare human vs AI-assisted path
Section titled “Compare human vs AI-assisted path”forgeplan estimate PRD-001 --grade seniorforgeplan estimate PRD-001 --grade aiThe AI line uses ×0.03–0.4 multipliers depending on item type; use both numbers to decide when to drive yourself vs delegate to an agent.
Manual complexity override
Section titled “Manual complexity override”forgeplan estimate PRD-001 --complexity FR-001=8,FR-002=2Use when heuristics misjudge complexity (e.g., an “easy” FR hides a migration).
LLM-scored estimation
Section titled “LLM-scored estimation”forgeplan estimate PRD-001 --llm-scoreAsks the configured LLM to score complexity per FR. Slower, but catches semantic nuance the rule engine misses.
Output interpretation
Section titled “Output interpretation”| Line | What it shows |
|---|---|
| per-FR row | complexity (Fibonacci) × grade-multiplier = item hours |
| Subtotal | sum of item hours |
| Review | +20% overhead for review cycles (adversarial, audit) |
| Safety | +15% buffer for surprise |
| Total | realistic sprint-planning number |
Red flag: totals over 40h — consider splitting the PRD or escalating depth.
How it fits the workflow
Section titled “How it fits the workflow”route → new → validate → estimate → sprint commit → code → calibrate-estimateFeed the total into your sprint capacity (a senior dev planning at 50% capacity has
~20h of “estimate hours” per week). After the sprint closes, calibrate-estimate
shows how accurate the number was.